Premier Technology

This project is a new 66,000 square foot manufacturing building with a 20,000 square foot two-story office structure. The main structural system is a pre-engineered steel building. AHJ provided the structural design for the foundation, slab on grade, masonry walls and stairs. The foundation system for the manufacturing building was designed to support heavy machinery as wells as several overhead bridge cranes with up to a 30 ton capacity. The office lobby stair structure is a circular, stainless steel design and required special design considerations

This entry was posted in Industrial. Bookmark the permalink.

Comments are closed.