Author Archives: admin

Herrett Center and Addition

This structure is an addition to an original masonry structure that more than doubles the facilities square footage. The main feature is a steel framed twelve sided barrel which houses a planetarium. A combination of steel and masonry is combined … Continue reading

Posted in Other Projects | Comments Off

Idaho History Center

This two-story, 35,850 square foot building addition houses Idaho‚Äôs historical library and archives. The building also includes administrative offices. The structural elements include an open web steel joist and deck roof, a steel/concrete composite second floor, and concrete slab on … Continue reading

Posted in Other Projects | Comments Off

Zoo Boise Entry

This project is a total redesign of the Boise Zoo entry, integrating a gift shop, concessions, a ticket booth, and a hands on display area. The structure is all wood frame using glu-lam beams with tube steel posts for the … Continue reading

Posted in Other Projects | Comments Off

Idaho Shakespeare Festival

This unique outdoor amphitheatre venue required very tall cast in place concrete retaining walls to support the earthen seating areas.

Posted in Other Projects | Comments Off

Hispanic Cultural Center

This two-story structure contains nearly 30,000 square feet of office space, classrooms, and museums. Its structural components consist of concrete masonry block bearing walls with open web steel trusses and concrete slab floors. The municipal room on the second floor … Continue reading

Posted in Other Projects | Comments Off

Midwest Flooring

This office/warehouse facility consists of tilt-up concrete panels designed to accommodate future “knock-out” openings as well as additional interior mezzanine loadings. The roof structure consists of steel deck over a steel delta roof joists system.

Posted in Industrial | Comments Off

Idaho Forest Industries

This warehouse was a replacement for the existing that was destroyed by fire. Construction was able to begin a month after the fire due to a “fast-track” design process. Due to the warehouses extreme length and width, the structure is … Continue reading

Posted in Industrial | Comments Off

Merchants Moving and Storage

This structure showcases the versatility and economy of a metal building while providing the durability of masonry walls. It incorporates an interior truck dock and high storage areas.

Posted in Industrial | Comments Off

Premier Technology

This project is a new 66,000 square foot manufacturing building with a 20,000 square foot two-story office structure. The main structural system is a pre-engineered steel building. AHJ provided the structural design for the foundation, slab on grade, masonry walls … Continue reading

Posted in Industrial | Comments Off

Power Bar Boise

This office, manufacturing and storage facility was designed and constructed using a “fast track” construction process. The design development and construction phases of this project were ongoing simultaneously. The vertical and lateral load carrying system is pre-cast concrete panels that … Continue reading

Posted in Industrial | Comments Off